Construction Technology of Shotcrete Machine for Foundation Pit Support
Release time:
2021-12-12 16:23
Source:
Saner Heavy Industry
Oh my way! Oh my way! Oh my way! Oh my way! Oh my way! Oh my 1.!Foundation pit support shotcrete machinesupport technology
Engineering technology: slope after slope excavation-dowel, erection of steel frame-suspended steel wire mesh-shotcrete.
The length of the steel bar is 14mm, the length is 1500mm @ 1500*1500mm distribution, the depth is 1400mm, and the exposed 100mm. 6 @ 1500mm * 1500mm keel reinforcement. Galvanized steel wire mesh (20*20mm) with 8# steel wire diameter of 2 mm is used vertically and horizontally, sprayed into concrete, and treated by wet method. The diameter of coarse aggregate is 5-10mm, and the surface layer is sprayed twice to ensure the safety of slope. Full.
Preparations for 2. construction. 1. Work conditions. (1) Learn to review drawings. (2) Investigate the site, understand the site topography, landform, geology, underground buried objects, above-ground obstacles, water and electricity supply and transportation roads, as the basis for calculating the amount of earthwork, selecting the construction scheme and organizing drainage. (3) Remove and clean the obstacles in the construction area, such as high-voltage lines, above-ground and underground pipelines, cables, trees, ditches and house foundations. (4) According to the design and construction requirements, do a good job of "three supplies and one leveling" in the construction area. The foundation adopts heavy excavation and all earthwork is transported outward. (5) Do a good job of measuring and setting out. In the range not affected by the foundation, set up the survey control network. Includes axes and leveling points. (6) Temporary facilities required for foundation pit construction, such as power supply, road, drainage and temporary facilities, shall be set up according to the construction plan.
The construction organization of the 3. foundation pit support shotcrete machine is an important link to ensure the construction quality and construction progress. The construction unit should be carried out according to the project, and the person in charge of the construction unit should be responsible for it respectively. Strengthen the organization and management of the project and implement the regular meeting system of the project. The team of construction workers is a team with rich construction technology. By making appropriate adjustments to the workers, it can ensure that the workers at all stages can be in place on time.
Construction Points of Shotcrete Machine Support for 4. Foundation Pit
The depth of sand spraying should not be less than 2cm, and the sprayed cement should also be 3-5cm.
The connection point between the outer edge protected by sand blasting or cement blasting and the slope protection must be tightly sealed. A small cut-off of 20*20cm can be opened at the upper part, or a groove can be opened in the rock with a depth of not less than 10cm, and the slope surface connected to it must be flat. On both sides of the slope, the depth of the trench should be more than 10cm.
When severe wind erosion occurs to the rock mass of the slope protection, the top of 1-2cm high and 40cm should be made, and the 5th cement mortar should be cut to protect the skirt.
Before spraying, the sloping soil and gravel must be cleaned and washed with clean water.
In order to adjust the proper water-cement ratio, tests must be carried out before mechanical or concrete construction. The water-cement ratio is too low, the surface is gray-black, there are dry spots, large rebound, dust drifts, and the water-cement ratio is too large, which will cause the ash body to wrinkle, roughen, slide, or even flow, the proportion is moderate, the gray matter is sticky, the surface is smooth, the aggregate is evenly distributed, and the rebound is less.
For the spray gun to work from the bottom up, the nozzle must be parallel to the ramp and spaced approximately 1 meter from the ramp.
In order to avoid clogging, in order to achieve a pipe length of 20-30 m, in order to fully mix the water and dry mixture, the working pressure of the nozzle is 1.5-1.7 MPa, and the nozzle water supply pressure (2.5 MPa) is greater than the working pressure 0.5-1.0 MPa.
When the sand blasting of the foundation pit support shotcrete machine reaches the initial setting, it should be sprayed and cured in time for 7~10 days.
The spray slurry and concrete protection works should be checked and repaired frequently. Weeds should be clear in time. When cracking, grouting and jointing should be carried out in time. When falling off, spraying should be carried out as soon as possible. Jet operation is strictly prohibited in icing season and weather.

Previous Page
Related News
With the rapid development of the modern construction industry, construction equipment is constantly innovating, which has brought a qualitative leap in engineering quality and efficiency. Today, we have the honor to introduce you to a high-profile new construction weapon-Saner heavy industry 25 meters long arm wet spray machine. This equipment integrates the three main functions of wet spraying, concrete conveying and soil spraying. With its excellent performance and powerful functions, it has attracted wide attention in the industry once it is launched.
In the beautiful spring and the recovery of all things, Saner Heavy Industry welcomed the leaders of the North Center of Real Estate Registration City. Their visit this time is not only a concern and support for our work, but also a great importance and affirmation of the party building work of Sany Heavy Industry. We are deeply honored, but also feel a great responsibility.
Recently, Saner Heavy Industry conducted a special test on the nozzle of the wet spray trolley, focusing on the flexibility of its spraying direction and steering. This test not only shows Saner Heavy Industry's ultimate pursuit of product details, but also lays a solid foundation for building an efficient spraying weapon.
Saner Wet Spraying Machine to Aid Shantou, China Railway 14th Bureau Subsea Tunnel Project
Recently, an advanced Saner wet spraying machine was successfully sent to Shantou, Guangdong, which will provide important support for the construction of the "Shantou Bay Subsea Tunnel" project undertaken by the 14th Bureau of China Railway. The arrival of this wet spraying machine marks another solid step in the mechanization and automation of the project construction, and injects new impetus into the smooth progress of the project.
Saner Heavy Industry Wet Spraying Machine Helps China Railway 14th Bureau
Recently, the SRSP40A manipulator wet spray trolley with its own air compressor developed by Saner Heavy Industry was sent to the construction site of Qipanqiao Tunnel.
Saner big event-ushered in the first employee retirement
Congratulations to Comrade Liu Ruoshi on his glorious retirement! Life opens a new chapter, Saner will always be your home, welcome to go home often! May the life after retirement be colorful, healthy and happy family!