Preparation and precautions of wet spraying machine before and after spraying


The operator of the wet spraying machine must bewet spraying machineThe personnel identified as qualified for technical training in production enterprises shall be specially assigned and cannot be replaced at will.

Saner heavy small series for you to introduce the wet spraying machine before and after the injection of the preparation and attention:

Wet spraying machine before spraying5Preparations;

When the wet spraying machine is turned on for the previous time, it is necessary to add lubricating oil to the cam body in place (the oil filling port is marked with a dipstick). In the future, it is often necessary to check the lubricating oil in the cam cavity and the reduction box to ensure that the lubricating oil is clean.

bConnect various pipelines as required to ensure smooth flow of pipelines.

cCheck the hopper to ensure that there is no slender foreign matter such as iron, wrench and iron wire.

dConnect the inspection equipment and electrical appliances, and ensure reliable grounding.

eGuide concrete mixing, control the workability of concrete (slump control.80mm-150mm)。

Wet spray machine in the jet6Note;

aCheck the system wind pressure, less0.5MpDo not start

bWhen preparing to turn on the wind, you must contact the jet operator and slowly open the main air valve. Too fast will cause the nozzle to shake violently, and the jet operator cannot control it, which is very likely to cause waiting injury.

cObserve the numerical changes of the system air pressure gauge and the working air pressure gauge. The value of the system air pressure gauge becomes smaller, which indicates that there is a problem with the air compressor or the pipeline is damaged. The working air pressure gauge becomes larger, which indicates that there is no concrete in the hopper.

dObserve the leakage of the nine slurry leakage holes under the rotor body. Serious leakage indicates that the piston has worn out.

eSupervise and urge the feeding personnel to require the feeding speed to be uniform, continuous and moderate, and always maintain a certain amount of concrete storage in the hopper to form the material column seal.

fAccording to the location of the sprayed surface and the performance of the concrete, the dosage of the accelerator should be adjusted appropriately.

Related News


Saner Heavy Industry 25 m Long Arm Wet Spraying Machine: Leading the New Trend of Industry, Debugging Exercise Shocks Attack!

With the rapid development of the modern construction industry, construction equipment is constantly innovating, which has brought a qualitative leap in engineering quality and efficiency. Today, we have the honor to introduce you to a high-profile new construction weapon-Saner heavy industry 25 meters long arm wet spray machine. This equipment integrates the three main functions of wet spraying, concrete conveying and soil spraying. With its excellent performance and powerful functions, it has attracted wide attention in the industry once it is launched.


Saner Heavy Industry warmly welcomes the leaders of the North Center of Real Estate Registration City to come and guide and participate in the grand party building activities.

In the beautiful spring and the recovery of all things, Saner Heavy Industry welcomed the leaders of the North Center of Real Estate Registration City. Their visit this time is not only a concern and support for our work, but also a great importance and affirmation of the party building work of Sany Heavy Industry. We are deeply honored, but also feel a great responsibility.


Saner Heavy Industry Wet Spray Truck Nozzle Test: Accurate Direction Control and Steering Flexibility to Create Efficient Spraying Tilt

Recently, Saner Heavy Industry conducted a special test on the nozzle of the wet spray trolley, focusing on the flexibility of its spraying direction and steering. This test not only shows Saner Heavy Industry's ultimate pursuit of product details, but also lays a solid foundation for building an efficient spraying weapon.


Saner Wet Spraying Machine to Aid Shantou, China Railway 14th Bureau Subsea Tunnel Project

Recently, an advanced Saner wet spraying machine was successfully sent to Shantou, Guangdong, which will provide important support for the construction of the "Shantou Bay Subsea Tunnel" project undertaken by the 14th Bureau of China Railway. The arrival of this wet spraying machine marks another solid step in the mechanization and automation of the project construction, and injects new impetus into the smooth progress of the project.


Saner Heavy Industry Wet Spraying Machine Helps China Railway 14th Bureau

Recently, the SRSP40A manipulator wet spray trolley with its own air compressor developed by Saner Heavy Industry was sent to the construction site of Qipanqiao Tunnel.


Saner big event-ushered in the first employee retirement

Congratulations to Comrade Liu Ruoshi on his glorious retirement! Life opens a new chapter, Saner will always be your home, welcome to go home often! May the life after retirement be colorful, healthy and happy family!