Preparation and precautions of wet spraying machine before and after spraying

The operator of the wet spraying machine must be a person who has been certified as qualified by the technical training of the wet spraying machine manufacturer, and a special person is responsible for it, and cannot be changed at will. Saner heavy small series for you to introduce the wet spraying machine before and after the injection of the preparation and attention: Five preparations of wet spraying machine before spraying; A when the wet spraying machine is turned on for the previous time, be sure to add lubricating oil to the cam body in place (there is a dipstick mark at the oil filler). in the future, the lubricating oil in the cam cavity and reduction box should be checked frequently to ensure the cleanliness of the lubricating oil. B Connect various pipelines as required to ensure smooth flow of pipelines. c Check the hopper to ensure that it is not mixed with slender foreign matters such as ironware, wrench and iron wire. d Connect and check the equipment and electrical appliances, and ensure reliable grounding. E guide concrete mixing, control the workability of concrete (slump control in 80mm-150mm). Wet spraying machine in the spray of 6 matters needing attention; A check the system wind pressure, less than 0.5Mp shall not start B When preparing to open the wind, you must contact the jet hand and open the main air valve slowly. Too fast will cause the nozzle to shake violently, and the jet hand cannot control it, which is very likely to cause waiting injury. c Observe the numerical changes of the system air pressure gauge and the working air pressure gauge. The value of the system air pressure gauge becomes smaller, which indicates that there is a problem with the air compressor or the pipeline is damaged. The working air pressure gauge becomes larger, which indicates that there is no concrete in the hopper. D pay attention to observe the leakage of nine slurry leakage holes under the rotor body. if the leakage is serious, it indicates that the piston has worn out. E supervise and urge the feeding personnel, requiring the feeding speed to be uniform, continuous and moderate, and always keep a certain amount of concrete storage in the hopper to form the material column seal. f According to the location of the sprayed surface and the performance of the concrete, adjust the dosage of the accelerator.

03

2021

/

07

< 1...78910 > proceed page